A customer required more load out capacity. Using customer supplied bins and a newly fabricated structure, we were able to provide them with more flexibility on small capacity runs. We also fabricated and installed a new conveyor system to transfer feed to the new load out bins. This included a distributor, bucket elevator, drag, and bridge structure.